Placer County

County seat: AuburnNorthern CaliforniaCCS Zone 2

Interactive Map

Placer County GIS Viewer
ESRI

Loading Placer County map viewer...

Assessor's Office

Property assessment data, parcel information, and assessor maps.

GIS / Parcel Viewer

Interactive online map with parcel boundaries, aerial imagery, and data layers.

County Surveyor

Records of Survey, Corner Records, and survey-related filings.

Surveying & Mapping (Community Development). Corner Records database searchable in the Survey Research Room. ROS via Recorder/Research Room.

California Survey Requirements & Records

The statewide rules that govern surveys, maps, and monuments in Placer County — plus our recorded-maps archive.

Recorded Map Examples in Placer County

Every map type Placer County records, with a real example on file where one has been archived.

Subdivision & Tentative Parcel Map Requirements

Municipal code citations, submittal checklists, and fees for the county and its largest city.

Placer County

Subdivision Ordinance

Tentative parcel maps: Placer County Code Title 16 (Subdivisions), Article 16.20 (Minor Subdivisions) governs tentative parcel maps (parcel maps of 4 or fewer parcels); see §16.20.230 (Tentative map preparation) and §16.20.240 (Data to accompany tentative map). Major subdivisions (5+ lots, tentative/final tract maps) are covered separately in Article 16.12 (Tentative Maps).

Submittal checklist →

eCode360 (ecode360.com) blocks automated fetches (403) so the article/section text was confirmed via Google-cached search snippets rather than a direct page fetch; the checklist PDF fetched cleanly and is titled 'Parcel Map Submittal Checklist' (Engineering & Surveying Division) but is actually the FINAL parcel map recording checklist, not a tentative map checklist — Placer directs tentative parcel map (Minor Land Division) applicants to a 'Universal Application Form' + 'Minor Environmental Questionnaire' plus department/supplemental checklists linked from https://www.placer.ca.gov/8281/Minor-Land-Divisions rather than a single standalone tentative-map PDF.

Tentative map review fee: $1,993 initial fee/deposit per resulting parcel (Minor Land Division – Parcel Map, i.e. tentative parcel map application) source · verified 2026-07

Single-sourced: verified by downloading the PDF and extracting text with pdftotext (fee schedule effective December 1, 2025, per its cover page). Could not find a second independent corroborating page restating this exact figure — a 2026 search for the amount only returned the same fee-schedule PDF. Note this is separate from the Engineering & Surveying Division's final Parcel Map recording/map-check deposit ($2,148 + $25/parcel, effective July 1, 2025, per the Parcel Map Submittal Checklist PDF above) — a subdivider incurs both fees at different stages.

Recording fee: $14 for the first page, $3 for each additional page (standard 8.5"x11" conforming document); non-conforming pages (oversized/undersized or with attachments) are $17 first page / $6 each additional page source · verified 2026-07

Corroborated by two live sources: the Clerk-Recorder FAQ page (QID=340) and the Clerk-Recorder's general Fee Schedule page (https://www.placer.ca.gov/1713/Fee-Schedule), both stating the same $14/$3 structure. Does not include Documentary Transfer Tax or additional indexing fees, which are separate line items.

City of Roseville

Subdivision Ordinance

Tentative parcel maps: Roseville Municipal Code Title 18 (Subdivisions), Chapter 18.05 (Tentative Map Applications) governs tentative parcel maps generally (§18.05.020 accepts applications only once map data requirements are met, with a director determination within 30 days); Chapter 18.16 (Final Maps and Parcel Maps) governs the final parcel map filed after tentative approval.

Submittal checklist →

eCode360 blocked direct fetch (403); chapter titles/section behavior confirmed via search-engine snippets of ecode360.com pages. Checklist PDF title is 'Application Checklist — Tentative Parcel Map (PM) or [Tentative Tract Map]', hosted on Roseville's CiviClive/CivicPlus asset CDN.

Tentative map review fee: $6,000 deposit (Tentative Parcel Map, 4 or fewer lots); $11,000 (5-99 lots); $16,000 (100-499 lots); $24,000 (500+ lots) source · verified 2026-07

Verified by downloading the PDF and extracting text with pdftotext (schedule cover page states 'Effective July 1, 2026'). A prior-year version of this same fee schedule (effective July 1, 2025) was located via search but its hosting URL (builder1.revize.com) now 404s, so it could not be used as a live second source — treat the $6,000 figure as single-sourced from the current official PDF.

Recording fee: Roseville does not record parcel/final maps itself — final and parcel maps are recorded with the Placer County Recorder, so see the county recordingFee entry above ($14 first page / $3 each additional page) source · verified 2026-07

Roseville Municipal Code Chapter 18.16 requires final/parcel maps to be filed with the City Engineer prior to tentative map expiration and then recorded through the county recorder per the Subdivision Map Act; Roseville itself charges only its own Final Parcel Map processing fee ($1,879 base + $75/lot, per the same fee-schedule PDF used above, Development Services Engineering Fees item 2), not a separate city recording fee.

Planning department

Surveyor's Toolbox

Research tools that pair with county records — look up licensees, run coordinate work, and pull federal land records.

Additional Resources